Project operation cooperation

Group News

Project Update | Suichuan County South Wastewater Treatment Plant Successfully Enters Trial Operation Stage

2026-09-10




Recently, the Suichuan County South Wastewater Treatment Plant, a key construction project of Suichuan County in 2025 undertaken by Tongyong Environmental Protection Group, has successfully entered the trial operation stage. At present, the equipment of all treatment units in the plant area has fully completed installation and commissioning, and the system has officially entered the water quality adaptation and commissioning cycle. Through building a refined and intelligent wastewater treatment system, the Group will continuously enhance the county’s wastewater treatment capacity and build a solid barrier for the protection of Suichuan County’s water ecological environment, the improvement of human settlements, and green and high-quality development.


Breaking Regional Challenges and Building a Full-Chain Water Treatment System


The total construction scale of the Suichuan County South Wastewater Treatment Plant is 50,000 m³/d, with the current implementation scale of 20,000 m³/d. Its service scope fully covers the south area of Suichuan County, Meijiang Town, and Yunling Industrial Park, effectively solving problems such as decentralized regional wastewater treatment and insufficient treatment capacity, and greatly improving the coverage rate of urban wastewater collection and the harmless treatment rate.

The project is equipped with a full set of standardized wastewater treatment structures and buildings, and simultaneously improves the off-site main wastewater pipeline network, building a full-chain, efficient wastewater treatment system of “wastewater collection—biochemical treatment—advanced purification—compliant discharge.”



Cutting-Edge Processes Empower Multiple Purification Barriers


The project core adopts the combined wastewater treatment process of “two-stage A/O reaction tank + secondary sedimentation tank + high-efficiency sedimentation tank + continuous sand filter,” integrating biochemical treatment and physicochemical advanced purification technologies to achieve gradual degradation. It has significant advantages such as strong shock resistance, stable operation, and excellent effluent quality. The effluent strictly implements the Grade A discharge standard of the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plants (GB18918-2002).

Four core sections work in synergy:

  • Two-stage A/O reaction tank: Through alternating cycles of multi-stage anoxic and aerobic environments, dedicated bacterial communities are cultivated. Compared with the traditional single-stage A/O, the two-stage system can effectively respond to fluctuations in influent water quality and quantity, efficiently remove nitrogen, and degrade indicators such as COD and BOD₅.

  • Secondary sedimentation tank: Relying on gravity sedimentation to quickly separate activated sludge and suspended solids, part of the sludge is returned to supplement microbial concentration, and the clarified supernatant enters subsequent advanced treatment.

  • High-efficiency sedimentation tank: Dedicated coagulation and flocculation chemicals are added to make fine suspended solids and phosphates cluster and settle, precisely overcoming the problem of incomplete biochemical phosphorus removal and effectively avoiding eutrophication of receiving water bodies.

  • Continuous sand filter: It achieves 24-hour uninterrupted filtration and fully automatic backwashing, precisely intercepts trace fine suspended particles, and comprehensively ensures stable compliance of effluent quality.




Multiple Purification Barriers

Craftsmanship and Fine Service, Strictly Guarding the Bottom Line of Quality and Safety


During the equipment installation and commissioning stage, the project team strictly followed construction specifications and technical standards, carried out refined installation of equipment, pipelines, and automatic control systems, and strictly controlled installation errors.

After installation was completed, technical personnel immediately carried out comprehensive commissioning, repeatedly verifying operation results under simulated conditions of different water quality and quantity, and promptly troubleshooting hidden dangers. At the same time, the project department integrated safety management throughout the entire process, regularly carried out safety inspections and pre-job training, focused on controlling risks in work at heights, temporary electricity, and confined spaces, and made every effort to safeguard the bottom line of safe production.


At present, the project is in a critical period of running-in and optimization during trial operation. After official operation, the Suichuan County South Wastewater Treatment Plant will greatly enhance the wastewater treatment carrying capacity of the south area of Suichuan County, Meijiang Town, and Yunling Industrial Park, thoroughly improve the current regional wastewater treatment situation, reduce water pollution from the source, and greatly improve the water ecological environment quality of the river basin.

Ecological prosperity leads to civilization prosperity, and clear waters flowing forever nourish all households. Tongyong Environmental Protection Group will continue to deepen its work in the field of water environment governance, uphold the original aspiration and mission of “cleaning pollution and purifying water, protecting the environment, quality and aesthetics, and honest service,” and actively serve local ecological civilization construction with high-standard engineering quality and superb technical services, contributing “Tongyong strength” to building a beautiful ecological picture of “harmony between people and water, and green development” in Beautiful China.


供 稿 | 工程部/徐文峰

编 辑 | 沈昕怡 季长宝

审 核 | 张铭尹